  • ColourWay Printing Factory (Birmingham City)
    Renovation and building works (Value of £155,000.00)
  • Fort Dunlop
    Transformation and separation of 27,000ft2 offices space to form smaller separate units / office space on 6th Floor.
    Refurbishment of existing 1,500ft2 offices on ground floor as well as carrying out the mechanical & electrical works. (Value £180,000.00)
  • Amazon
    Completed an 18 week refurbishment project for at one of the UK’s biggest fulfilment centres In Swansea. (Value £270,000.00)
  • Starbucks, Footlocker, Screwfix, Co-op & Sainsbury’s through Main Contractor Bridgefords Interiors
    M&E Shop-fitting work for a 2-3 week period per project, including out of hours and working in a live and active environment. (Value £70,000.00)
  • Savills Poole
    Providing insurance rectification works and construction services and fit out, including making good of defects to 104 apartments. This included the fit out of the commercial space to the development. In addition, planned preventative maintenance works for the M&E installations (values varied)
  • Domestic Contract
    Completion of double story domestic extensions in Knowle Solihull (£60,000.00)

Recent Clients

SHB carried out a 16 week project to renovate Amazons existing Toilet & Shower facilities to incorporate sensor-matic taps, soap dispensers, showers and Squat Pans during lockdown from Coronavirus  July 2020.

SHB adapted to the worldwide pandemic to keep staff and co workers as safe as could be, implementing social distancing, high standard welfare facilities and continuing to monitor the project daily. We were glad to report that no one within our team was affected by Covid 19, and against all odds, the project was handed back in time.

SHB has carried out a number a Mechanical fit outs to the Fast-growing Starbucks coffee shops, with Stoke & Northampton being some of the most recent.

During Lockdown, SHB delivered on a nationwide rollout with works undertaken at the Sainsburys Cafes.

Mechanical & Electrical Installations

Mechanical Installations

SHB & AJ Design carried a complete overhaul at the Printing Factory in Bham.
Construction, Mechanical & Roofing upgrades.

At the start of Lockdown, March 2020

SHB carried out a massive renovation project for Fort Dunlop, Splitting over 24,000 sq ft of commercial space, into new CAT B office spaces, This included Partitions & Ceilings, New raised access flooring, Mechanical Ventilation , Air condition, Electrical fit out, New floor coverings & decorations.

High class café refit.